Browsing by Title

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 227 to 246 of 2631 < previous   next >
Issue DateTitleAuthor(s)
2017DatabrarianshipMrozewski, Tomasz
18-Dec-2015(De)Constructing the American sport hero: a textual analysis of media representations of Vince Lombardi.Hull, Michael R.
1999DebatesGoltz, Eileen
15-Jun-2010Decolonisation as a social change framework and its impact on the development of Indigenous-based curricula for Helping Professionals in mainstream Tertiary Education OrganisationsMoeke-Pickering, Taima
10-Nov-1998Decommissioning mine waste management areas : design parameters for utilizing wetlands/muskeg for the Farley Lake mine property, Keystone Gold, Black Hawk Mining Inc. in the vicinity of Lynn Lake, northern ManitobaBoojum Research Limited
22-Dec-1993The decommissioning of Buchans unit : assessment of hydrological modifications and implementation of biological polishing (stage 1) : 1993 /final report / Prepared for G. Neary, Buchans Unit, ASARCO, Joint Venture Group at Buchans NFLD., ASARCO INC. Abitibi-Price Inc.-
15-Jan-1994The decommissioning of Buchans Unit and implementation of biological polishing : 1994 final report / prepared for G. Neary, Buchans Unit, ASARCO, Joint Venture Group at Buchans NFLD, ASARCO INC. - Abitibi-Price Inc.-
27-Jan-1997The decommissioning of Buchans unit, ASARCO : zinc removal strategy : 1996 final report / prepared for G. Neary, Buchans Unit, ASARCO , Joint Venture Group at Buchans, NFLD ASARCO Inc. - Abitibi-Price Inc.-
13-Feb-1992The decommissioning of Les Mines Selbaie.Boojum Research Limited
Apr-1993Decommissioning of South Bay Mine using ecological engineering.Kalin, Margarete; BP Resources Canada Limited
Mar-1997Decommissioning of South Bay: phosphate rock/brush application in Boomerang Lake, EM34 background Mud Lake survey, seepage canyon definition: 1995 final report / Submitted to: Mr. David Porter Talisman Energy Inc.Boojum Research Limited
Mar-1997Decommissioning of South Bay: phosphate rock/brush application in Boomerang Lake; EM34 background Mud Lake survey; seepage Canyon definiton: 1995 final report / submitted to Mr. David Porter (Talisman Energy Inc.)-
14-Jan-1995The decommissioning of the B-zone flooded pit with ecological engineering : 1994 final reportBoojum Research Limited
12-Mar-1997Decommissioning of the B-zone waste rock pile : 1996 final report / for CAMECO CorporationKalin, Margarete; Smith, M. P.
31-Jan-1995The decommissioning of the b-zone with ecological engineering : 1994 final reportBoojum Research Limited
20-Dec-1994Decommissioning of the South Bay Mine using ecological engineering : final report.Kalin, Margarete
Aug-2007Defining Literacies: The Complex Literacies Use And Understandings Of Tree ChildrenWood, Jeffrey W.
1-Mar-2018Dementia informal caregivers’ experience with hospital discharge planning post-dischargeOwusua, Adwoa
7-Jun-2016Demonstrating Anishinaabe storywork circle pedagogy: creating conceptual space for ecological relational knowledge in the classroom.Peltier, Sharla
17-Mar-2014Deposition and characterization of mesoporous silica coatings on magnesium alloysAl Hegy, Afrah