Title: | The decommissioning of Buchans unit, ASARCO : zinc removal strategy : 1996 final report / prepared for G. Neary, Buchans Unit, ASARCO , Joint Venture Group at Buchans, NFLD ASARCO Inc. - Abitibi-Price Inc. |
Keywords: | decommissioning mines;zinc removal;drainage tunnel;polishing ponds;Oriental east pit (OEP);Oriental west pit (OWP);tailings ponds;winter problem |
Issue Date: | 27-Jan-1997 |
Series/Report no.: | Boojum Technical Reports;;AB059 |
Abstract: | Report discusses the strategy developed to remove zinc following the decommissioning of the Buchans unit. |
URI: | https://zone.biblio.laurentian.ca/handle/10219/2971 |
Appears in Collections: | Boojum Technical Reports |