Skip navigation
LU
ZONE
UL
Home
Browse
Communities
& Collections
Browse Items by:
Issue Date
Author
Title
Subject
Help
FAQ
Language
français
English
Sign on to:
My LU|ZONE|UL
Receive email
updates
Edit Profile
LU|ZONE|UL @ Laurentian University
Browsing by Author Boojum Research Limited
Jump to:
0-9
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
or enter first few letters:
Sort by:
title
issue date
submit date
In order:
Ascending
Descending
Results/Page
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
Authors/Record:
All
1
5
10
15
20
25
30
35
40
45
50
Showing results 9 to 28 of 35
< previous
next >
Preview
Issue Date
Title
Author(s)
Dec-1990
Cape Breton Development Corporation : ecological engineering for VJ bogs and data summary : final report
Boojum Research Limited
10-Nov-1998
Decommissioning mine waste management areas : design parameters for utilizing wetlands/muskeg for the Farley Lake mine property, Keystone Gold, Black Hawk Mining Inc. in the vicinity of Lynn Lake, northern Manitoba
Boojum Research Limited
13-Feb-1992
The decommissioning of Les Mines Selbaie.
Boojum Research Limited
Mar-1997
Decommissioning of South Bay: phosphate rock/brush application in Boomerang Lake, EM34 background Mud Lake survey, seepage canyon definition: 1995 final report / Submitted to: Mr. David Porter Talisman Energy Inc.
Boojum Research Limited
14-Jan-1995
The decommissioning of the B-zone flooded pit with ecological engineering : 1994 final report
Boojum Research Limited
31-Jan-1995
The decommissioning of the b-zone with ecological engineering : 1994 final report
Boojum Research Limited
Apr-1992
EM survey, South Bay Reclamation Project, South Bay, Ontario.
Geomar Geophysics Limited
;
Boojum Research Limited
Nov-1995
EM surveys maps : South Bay Mine site : final report 1995.
Boojum Research Limited
Nov-1995
EM surveys maps, Mud Lake area and interpretation of electromagnetic surveys and follow-up anomaly testing (piozemeter installation), September 30, 1995 : final report 1995.
Boojum Research Limited
Dec-1993
Evaluation of passive process water treatment.
Boojum Research Limited
;
Kennecott Corporation, Plant Projects Group
21-Nov-2013
Final report: selenium removal from coal mine valley ; fill effluents using Chara ARIES subtask 2.2.3
Boojum Research Limited
;
Scribalo, Robin
;
Paulo, Carlos
;
Kalin, Margarete A.
;
Wheeler, William H.
Aug-2003
General observations and summary comments on monitoring data : visit to McIntyre closure sites including tailings pond plus superficial inspection of ERG tailings site : Timmins August 18-19, 2003 -- meetings with Joint Venture and site visits.
Michael P. Sudbury Consulting Services
;
Boojum Research Limited
;
Joint Venture Group
Jun-1994
Hydrological and microbiological research in support of AMD prevention for waste rock and tailings : final report.
Boojum Research Limited
Sep-1995
Hydrology, South Bay 1995 : data summary.
Boojum Research Limited
Nov-2000
In-situ groundwater treatment using ARUM: IRAP/NRC final report 2000
Boojum Research Limited
15-Jan-1996
Inhibition of acid generation using phosphate rock : final report.
Boojum Research Limited
Nov-1992
Les Mines Selbaie : decommissioning with ecological engineering
Boojum Research Limited
;
BP Resources Canada Limited
23-Feb-2004
McIntyre Tailings Dam No. 3 : laboratory analysis.
Boojum Research Limited
Nov-1996
Nickel and arsenic adsorption onto mucilage producing algal colonies : final report : CANMET, CAMECO - March 1997
Boojum Research Limited
Dec-2000
pH history and potential pH development for 1996 and 1998 water samples from selected piezometers at South Bay.
Boojum Research Limited