Veuillez utiliser cette adresse pour citer ce document : https://zone.biblio.laurentian.ca/handle/10219/3021
Titre: Abandonment plan for South Bay Mines, BP Resources, Selco Division.
Autre titres: Phase 1. Detailed site assessment and abandonment approach.
Auteurs: Kalin, Margarete A.
BP Resources Canada Limited. Selco Division
Mots clés: South Bay Mine;environmental conditions;ecological engineering approach;waste management area;abandonment approach
Date publié: fév-1987
Éditeur: Boojum Research Limited
Numéro de rapport/série: Boojum Technical Reports;SB001
Abstrait: It was essential for our attempted formulation of close-out measures for the South Bay Mine site to assess the existing environmental conditions. Background information was reviewed, and an Ecological Engineering approach was drafted, based on evaluations carried out between April and July, 1986. In a presentation to the Ministry of the Environment, Northwestern Region, Kenora, submissions were made respecting the approach being taken and the experiments underway (August 19, 1986). Approval in principle was obtained for the pilot demonstration in September, 1986, of Ecological Engineering measures for close-out and abandonment of the copper and zinc concentrator wastes at South Bay Mines, BP Resources, Selco Division.
Description: In fulfillment of P.O. #1204.
URI: https://zone.biblio.laurentian.ca/handle/10219/3021
Apparaît dans les collections:Boojum Technical Reports

Fichiers dans cet item:
Fichier Description TailleFormat 
SB001.pdf5.35 MBAdobe PDFThumbnail
Parcourir/Ouvrir


Tous les documents dans DSpace sont protégés par copyright, avec tous droits réservés.