Veuillez utiliser cette adresse pour citer ce document : https://zone.biblio.laurentian.ca/handle/10219/2969
Titre: The decommissioning of Buchans Unit and implementation of biological polishing : 1994 final report / prepared for G. Neary, Buchans Unit, ASARCO, Joint Venture Group at Buchans NFLD, ASARCO INC. - Abitibi-Price Inc.
Mots clés: Buchans waste management area;biological polishing;ecological engineering;zinc removal;Oriental east gloryhole (OEP);decommissioning mine;Oriental west gloryhole (OWP);drainage tunnel;tailings ponds;water quality
Date publié: 15-jan-1994
Numéro de rapport/série: Boojum Technical Reports;;AB048
Abstrait: Report examines the water quality of the East and West Oriental Pits prior to, and following their connection. The report also provides recommendations for the program in the coming year.
URI: https://zone.biblio.laurentian.ca/handle/10219/2969
Apparaît dans les collections:Boojum Technical Reports

Fichiers dans cet item:
Fichier Description TailleFormat 
AB048.pdf3.99 MBAdobe PDFThumbnail
Parcourir/Ouvrir


Tous les documents dans DSpace sont protégés par copyright, avec tous droits réservés.