Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results.


Results 61-70 of 99 (Search time: 0.151 seconds).
Item hits:
PreviewIssue DateTitleAuthor(s)
CN020.PDF.jpg20-Apr-1994Arsenic and nickel removal from waste rock seepages using muskeg sediment : final reportBoojum Research Limited
CN022.PDF.jpg30-Jul-1994Biological polishing phase IV : model verification and scale-up : final reportBoojum Research Limited
AB029.pdf.jpg23-Jan-1992The application of ecological engineering for close-out at Buchans : final report / for ASARCO Incorporated Buchans Unit and Abitibi-Price Incorporated-
AB059.PDF.jpg27-Jan-1997The decommissioning of Buchans unit, ASARCO : zinc removal strategy : 1996 final report / prepared for G. Neary, Buchans Unit, ASARCO , Joint Venture Group at Buchans, NFLD ASARCO Inc. - Abitibi-Price Inc.-
CN027.PDF.jpgMay-1996Controlling factors in the production of extracellular polysaccharides in phytoplankton : final reportKalin, Margarete A.; Olaveson, M.
AB034.pdf.jpgDec-1992The application of ecological engineering for close-out at Buchans : final report /prepared for Mr. George Neary, Joint Venture Group at Buchans NFLD., ASARCO INC. - Abitibi-Price Inc.Kalin, Margarete A.
SB012.pdf.jpg31-Mar-1991Periphyton communities as biological polishing agents in mine waste waters and the precipitation process in tailings : final report.Kalin, Margarete A.; Wheeler, W. N.; Van Everdingen, R. O.; Canada Centre for Mineral and Energy Technology
CN004F.pdf.jpgSep-1991The effects of foliar fertilization on the plant productivity and biomass in cattails growing on acidic mine tailings / presented as an ERS 490 final report to: Dr. James KayEnglish, M. W.
SB042.pdf.jpgNov-1995Piezometer locations : comparison of airquest, total station and GPS surveys : final report 1995.-
KN001.PDF.jpgDec-1993Evaluation of passive process water treatment.Boojum Research Limited; Kennecott Corporation, Plant Projects Group