Browsing by Author Kalin, Margarete A.

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 21 to 40 of 75 < previous   next >
PreviewIssue DateTitleAuthor(s)
CN027.PDF.jpgMay-1996Controlling factors in the production of extracellular polysaccharides in phytoplankton : final reportKalin, Margarete A.; Olaveson, M.
SB025.pdf.jpgApr-1993Decommissioning of South Bay Mine using ecological engineering.Kalin, Margarete A.; BP Resources Canada Limited
CA077.PDF.jpg12-Mar-1997Decommissioning of the B-zone waste rock pile : 1996 final report / for CAMECO CorporationKalin, Margarete A.; Smith, M. P.
SB035.pdf.jpg20-Dec-1994Decommissioning of the South Bay Mine using ecological engineering : final report.Kalin, Margarete A.
FB001.pdf.jpgMar-1986Developing a technique for reclamation of high iron sulphur tailings by establishing a marshland : phase 1, selection of suitable plant material and methods of establishment.Kalin, Margarete A.; Falconbridge Limited
KD005.PDF.jpgMar-1988The development of ecological engineering and biological polishing methods for the Metsite.Kalin, Margarete A.
AR002.pdf.jpgMar-1986Ecological engineering : tests of concepts and assumptions on Levack, Year 1 : ecologyKalin, Margarete A.
AR003.pdf.jpgMar-1987Ecological engineering : tests of concepts and assumptions on Levack, Year 2: confirmation of conceptsKalin, Margarete A.
FA003.PDF.jpg31-Aug-1990Ecological engineering and biological polishing for drainage from the Faro waste rock dumpsKalin, Margarete A.; van Everdingen, R.O.
CA009.pdf.jpg21-Feb-1992Ecological engineering and the Chara process applied to the Rabbit Lake drainage basin : final report / for CAMECOSmith, M. P.; Kalin, Margarete A.
CN035.pdf.jpg30-Oct-1987Ecological engineering for gold and base metal mining operations in the Northwest Territories : final report / for M. Barnett, Northern Environment DirectorateKalin, Margarete A.
AM004.pdf.PDF.jpgJul-1993Ecological engineering for the decommissioning of the Claude PitKalin, Margarete A.
AR001.pdf.jpg10-May-1985Ecological engineering tests of concepts and assumptions on Levack / proposed by M. Kalin for discussion with INCO LtdKalin, Margarete A.
AR004.pdf.jpgSep-1987Ecological engineering: tests of concepts and assumptions on Levack, Phase III : biological seepage treatmentKalin, Margarete A.
CH001.pdf.jpg8-Apr-1985A feasibility investigation of the potential use of the "Chara process" and indigenous biota as passive polishing agents for cyanide in waste liquors at Arvida / for D.O. Johnson, Alcan International Ltd., Kingston LaboratoriesKalin, Margarete A.
AR001A.pdf.jpg15-Apr-1985A feasibility study on the use of the Chara process and an assessment of the reclamation by ecological engineering for the Levack tailings / prepared for T. Peters (Agriculture INCO) by M. KalinKalin, Margarete A.
ZZ009.pdf.jpg21-Nov-2013Final report: selenium removal from coal mine valley ; fill effluents using Chara ARIES subtask 2.2.3Boojum Research Limited; Scribalo, Robin; Paulo, Carlos; Kalin, Margarete A.; Wheeler, William H.
CN003A.PDF.jpg31-Mar-1987Growth dynamics of naturally colonizing Characeae in abandoned tailings ponds : final reportKalin, Margarete A.; Smith, M. P.
IES007.pdf.PDF.jpg30-Mar-2006Identification of potential environmental problems at Port Radium : field report, in search of uranium mill tailings / Submitted to, Mr. D. Sutherland (Environmental Protection Service ; Environment Canada)Kalin, Margarete A.
MN001.pdf.jpg1-Jan-1985Kam-Kotia : phase 1 & 2 / for Ministry of Natural Resources Timmins, OntarioKalin, Margarete A.