Please use this identifier to cite or link to this item: https://zone.biblio.laurentian.ca/handle/10219/2970
Title: Polishing ponds performance evaluation and long term considerations : 1995 final report / Prepared for G. Neary, Buchans Unit, ASARCO Joint Venture Group at Buchans NFLD ASARCO INC. - Abitibi-Price Inc.
Keywords: Buchans waste management area;Oriental west pit (OWP);drainage tunnel;Oriental east pit (OEP);tailings ponds;decommissioning mine
Issue Date: 16-Jan-1996
Series/Report no.: Boojum Technical Reports;;AB051
Abstract: Report discusses the developments in the project during 1995.
URI: https://zone.biblio.laurentian.ca/handle/10219/2970
Appears in Collections:Boojum Technical Reports

Files in This Item:
File Description SizeFormat 
AB051.PDF12.05 MBAdobe PDFThumbnail
View/Open


Items in LU|ZONE|UL are protected by copyright, with all rights reserved, unless otherwise indicated.