Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 131-140 of 183 (Search time: 0.048 seconds).
Item hits:
PreviewIssue DateTitleAuthor(s)
CA082.PDF.jpgJul-1998B-zone waste rock pile : utilization of wetlands for removal of arsenic and nickelBoojum Research Limited
SB055.pdf.jpgMar-1997Decommissioning of South Bay: phosphate rock/brush application in Boomerang Lake, EM34 background Mud Lake survey, seepage canyon definition: 1995 final report / Submitted to: Mr. David Porter Talisman Energy Inc.Boojum Research Limited
SB046.PDF.jpg19-May-1995Phosphate rock requirement for Boomerang Lake : laboratory experiments to determine best rock type and application ratesFyson, A.; Smith, M. P.
SB047.pdf.jpgNov-1995EM surveys maps : South Bay Mine site : final report 1995.Boojum Research Limited
HB001.pdf.jpg31-Aug-1988Assessment of seepage characteristics waste rock pile and holding pond : Hope Brook Gold Mines Ltd.Kalin, Margarete A.; Van Everdingen, R. O.; Hope Brook Gold Mines Limited.
CA110.pdf.jpgJan-2006Soil/sediment interaction with ground and surface water during lake recovery : potential biological treatment measures 1998-2003 : laboratory simulationsKalin, Margarete A.
DV010.PDF.jpgDec-1990Cape Breton Development Corporation : ecological engineering for VJ bogs and data summary : final reportBoojum Research Limited
SB092.pdf.jpgNov-2000In-situ groundwater treatment using ARUM: IRAP/NRC final report 2000Boojum Research Limited
PM003.PDF.jpgAug-1992An assessment of Prince Colliery effluents and their treatment : final report.Kalin, Margarete A.; Dearborn Environmental Consulting Group
SB045.pdf.jpgNov-1995Mud Lake ARUM experiment and biogeochemical barriers in mine waste restoration : an ecological engineering approach : final report 1995Kalin, Margarete A.