Veuillez utiliser cette adresse pour citer ce document : https://zone.biblio.laurentian.ca/handle/10219/2951
Titre: The application of ecological engineering for close-out at Buchans : final report / for ASARCO Incorporated Buchans Unit and Abitibi-Price Incorporated
Mots clés: ecological engineering;Buchans mine;Lucky Strike;drainage tunnel;biological polishing;natural phosphate rock treatment;ARUM (Acid Reduction Using Microbiology);mine closure
Date publié: 23-jan-1992
Numéro de rapport/série: Boojum Technical Reports;;AB029
Abstrait: Report examines the use of ecological engineering at the Buchans mine. The processes employed to assist in rehabilitation continued to be successful, as such Boojum Research was asked to expand their test area to include the Lucky Strike Drainage Tunnel.
URI: https://zone.biblio.laurentian.ca/handle/10219/2951
Apparaît dans les collections:Boojum Technical Reports

Fichiers dans cet item:
Fichier Description TailleFormat 
AB029.pdf6.81 MBAdobe PDFThumbnail
Parcourir/Ouvrir


Tous les documents dans DSpace sont protégés par copyright, avec tous droits réservés.