Veuillez utiliser cette adresse pour citer ce document :
https://zone.biblio.laurentian.ca/handle/10219/2951
Titre: | The application of ecological engineering for close-out at Buchans : final report / for ASARCO Incorporated Buchans Unit and Abitibi-Price Incorporated |
Mots clés: | ecological engineering;Buchans mine;Lucky Strike;drainage tunnel;biological polishing;natural phosphate rock treatment;ARUM (Acid Reduction Using Microbiology);mine closure |
Date publié: | 23-jan-1992 |
Numéro de rapport/série: | Boojum Technical Reports;;AB029 |
Abstrait: | Report examines the use of ecological engineering at the Buchans mine. The processes employed to assist in rehabilitation continued to be successful, as such Boojum Research was asked to expand their test area to include the Lucky Strike Drainage Tunnel. |
URI: | https://zone.biblio.laurentian.ca/handle/10219/2951 |
Apparaît dans les collections: | Boojum Technical Reports |
Fichiers dans cet item:
Fichier | Description | Taille | Format | |
---|---|---|---|---|
AB029.pdf | 6.81 MB | Adobe PDF | Parcourir/Ouvrir |
Tous les documents dans DSpace sont protégés par copyright, avec tous droits réservés.