Please use this identifier to cite or link to this item: https://zone.biblio.laurentian.ca/handle/10219/3014
Title: General observations and summary comments on monitoring data : visit to McIntyre closure sites including tailings pond plus superficial inspection of ERG tailings site : Timmins August 18-19, 2003 -- meetings with Joint Venture and site visits.
Authors: Michael P. Sudbury Consulting Services
Boojum Research Limited
Joint Venture Group
Keywords: McIntyre closure sites;Porcupine River;McIntyre and Hollinger tailings;ERG tailings;Little Pearl Lake;Gillies Lake;decommissioning plan;groundwater contamination;monitoring data
Issue Date: Aug-2003
Publisher: Boojum Research Limited
Series/Report no.: Boojum Technical Reports;TM001
Abstract: Report provides information about the ERG tailings areas and water quality in the Porcupine river.
URI: https://zone.biblio.laurentian.ca/handle/10219/3014
Appears in Collections:Boojum Technical Reports

Files in This Item:
File Description SizeFormat 
TM001.pdf339.75 kBAdobe PDFThumbnail
View/Open


Items in LU|ZONE|UL are protected by copyright, with all rights reserved, unless otherwise indicated.