Please use this identifier to cite or link to this item:
https://zone.biblio.laurentian.ca/handle/10219/2951
Title: | The application of ecological engineering for close-out at Buchans : final report / for ASARCO Incorporated Buchans Unit and Abitibi-Price Incorporated |
Keywords: | ecological engineering;Buchans mine;Lucky Strike;drainage tunnel;biological polishing;natural phosphate rock treatment;ARUM (Acid Reduction Using Microbiology);mine closure |
Issue Date: | 23-Jan-1992 |
Series/Report no.: | Boojum Technical Reports;;AB029 |
Abstract: | Report examines the use of ecological engineering at the Buchans mine. The processes employed to assist in rehabilitation continued to be successful, as such Boojum Research was asked to expand their test area to include the Lucky Strike Drainage Tunnel. |
URI: | https://zone.biblio.laurentian.ca/handle/10219/2951 |
Appears in Collections: | Boojum Technical Reports |
Items in LU|ZONE|UL are protected by copyright, with all rights reserved, unless otherwise indicated.