Please use this identifier to cite or link to this item: https://zone.biblio.laurentian.ca/handle/10219/2940
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKalin, Margarete A.-
dc.coverage.spatialKam-Kotia, Ont. Mine Site (Timmins, Ontario)-
dc.coverage.spatial48.3524,-81.3636-
dc.date.accessioned2018-03-15T15:01:00Z-
dc.date.available2018-03-15T15:01:00Z-
dc.date.issued1985-01-01-
dc.identifier.urihttps://zone.biblio.laurentian.ca/handle/10219/2940-
dc.description.abstractThis report summarizes the results of the assessments and outlines a general concept for reclaiming the Kam-Kotia (KK) tailings with ecological engineering measures.The discussion of the preliminary findings is presented in the report as Phase 1. As the requirements for this approach appeared very promising a detailed outline for a Phase 2 pilot project is provided in Appendix A. The pilot project defines more precisely the long term viability of the proposed approach and will result in realistic costing parameters for the overall reclamation scheme of the site.en_CA
dc.language.isoenen_CA
dc.relation.ispartofseriesBoojum Technical Reports;;MN001-
dc.subjectacid-generating tailingsen_CA
dc.subjectKam-Kotia tailingsen_CA
dc.subjectreclamation measuresen_CA
dc.subjectecological engineeringen_CA
dc.titleKam-Kotia : phase 1 & 2 / for Ministry of Natural Resources Timmins, Ontarioen_CA
dc.title.alternativeKam-Kotia tailings : reclamation by ecological engineering-
dc.typeTechnical Reporten_CA
Appears in Collections:Boojum Technical Reports

Files in This Item:
File Description SizeFormat 
MN001.pdf3.91 MBAdobe PDFThumbnail
View/Open


Items in LU|ZONE|UL are protected by copyright, with all rights reserved, unless otherwise indicated.