Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results.


Results 21-30 of 99 (Search time: 0.095 seconds).
Item hits:
PreviewIssue DateTitleAuthor(s)
AR022A.pdf.jpgJul-1993Treatment of acidic seepages employing wetland ecology and microbiology : overall program assessment : final reportKalin, Margarete A.
SB113.pdf.jpg20-Jan-1999Implications of the draining of Mill Pond: addendum / Review prepared for M. Kalin, Boojum Research Ltd, TorontoVonhof Consulting Limited
CA080.pdf.jpgMay-1997B-zone pit : limnology 1993-1996 and the fate of arsenic and nickel : final report / for CAMECO CorporationBoojum Research Limited
CA082.PDF.jpgJul-1998B-zone waste rock pile : utilization of wetlands for removal of arsenic and nickelBoojum Research Limited
SB055.pdf.jpgMar-1997Decommissioning of South Bay: phosphate rock/brush application in Boomerang Lake, EM34 background Mud Lake survey, seepage canyon definition: 1995 final report / Submitted to: Mr. David Porter Talisman Energy Inc.Boojum Research Limited
SB046.PDF.jpg19-May-1995Phosphate rock requirement for Boomerang Lake : laboratory experiments to determine best rock type and application ratesFyson, A.; Smith, M. P.
SB047.pdf.jpgNov-1995EM surveys maps : South Bay Mine site : final report 1995.Boojum Research Limited
DV010.PDF.jpgDec-1990Cape Breton Development Corporation : ecological engineering for VJ bogs and data summary : final reportBoojum Research Limited
PM003.PDF.jpgAug-1992An assessment of Prince Colliery effluents and their treatment : final report.Kalin, Margarete A.; Dearborn Environmental Consulting Group
SB045.pdf.jpgNov-1995Mud Lake ARUM experiment and biogeochemical barriers in mine waste restoration : an ecological engineering approach : final report 1995Kalin, Margarete A.