Search


Current filters:
Start a new search
Add filters:

Use filters to refine the search results.


Results 31-40 of 99 (Search time: 0.006 seconds).
Item hits:
PreviewIssue DateTitleAuthor(s)
AB040.PDF.jpg22-Dec-1993The decommissioning of Buchans unit : assessment of hydrological modifications and implementation of biological polishing (stage 1) : 1993 /final report / Prepared for G. Neary, Buchans Unit, ASARCO, Joint Venture Group at Buchans NFLD., ASARCO INC. Abitibi-Price Inc.-
AB048.pdf.jpg15-Jan-1994The decommissioning of Buchans Unit and implementation of biological polishing : 1994 final report / prepared for G. Neary, Buchans Unit, ASARCO, Joint Venture Group at Buchans NFLD, ASARCO INC. - Abitibi-Price Inc.-
AB039.PDF.jpg5-Aug-1993Connection of the drainage tunnel with the Oriental Pits : geochemical and hydrological considerationsKalin, Margarete A.
SB025.pdf.jpgApr-1993Decommissioning of South Bay Mine using ecological engineering.Kalin, Margarete A.; BP Resources Canada Limited
SB055.pdf.jpgMar-1997Decommissioning of South Bay: phosphate rock/brush application in Boomerang Lake; EM34 background Mud Lake survey; seepage Canyon definiton: 1995 final report / submitted to Mr. David Porter (Talisman Energy Inc.)-
DV013.pdf.jpg25-Feb-1997Laboratory and field investigations examining the inhibition of acid generation from pyritic materials : perd coal waste rock piles field observations and reportBaechler, Fred; ADI Nolan Davis
AR012.pdf.jpg31-Mar-1991Treatment of acidic seepages employing wetland ecology and microbiology : final reportKalin, Margarete A.
CN007.PDF.jpg20-Mar-1992A study of algae-precipitate interactions / by M. Kalin and W. N. WheelerKalin, Margarete A.; Wheeler, W. N.
PH006.PDF.jpgJun-1994Hydrological and microbiological research in support of AMD prevention for waste rock and tailings : final report.Boojum Research Limited
AL002.PDF.jpg21-Sep-1998A review of the lagoon systems ALCAN Kitimat smelter : final report-