Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results.


Results 1-10 of 13 (Search time: 0.01 seconds).
Item hits:
PreviewIssue DateTitleAuthor(s)
AB029.pdf.jpg23-Jan-1992The application of ecological engineering for close-out at Buchans : final report / for ASARCO Incorporated Buchans Unit and Abitibi-Price Incorporated-
AB034.pdf.jpgDec-1992The application of ecological engineering for close-out at Buchans : final report /prepared for Mr. George Neary, Joint Venture Group at Buchans NFLD., ASARCO INC. - Abitibi-Price Inc.Kalin, Margarete A.
SB012.pdf.jpg31-Mar-1991Periphyton communities as biological polishing agents in mine waste waters and the precipitation process in tailings : final report.Kalin, Margarete A.; Wheeler, W. N.; Van Everdingen, R. O.; Canada Centre for Mineral and Energy Technology
CN004E.pdf.jpg20-Aug-1991An evaluation of methods required to determine overwintering plant health in cattails growing on acidic mine tailingsEnglish, M. W.
AB048.pdf.jpg15-Jan-1994The decommissioning of Buchans Unit and implementation of biological polishing : 1994 final report / prepared for G. Neary, Buchans Unit, ASARCO, Joint Venture Group at Buchans NFLD, ASARCO INC. - Abitibi-Price Inc.-
SB025.pdf.jpgApr-1993Decommissioning of South Bay Mine using ecological engineering.Kalin, Margarete A.; BP Resources Canada Limited
CA084.PDF.jpgFeb-1999B-zone pit : the fate of arsenic and nickel, the proof is in the sediment : final report / for CAMECO CorporationBoojum Research Limited
AB005.PDF.jpgJan-1990Ecological engineering close-out scenario : phase 1 report feasibility study / for Asarco Incorporated Buchans Unit-
SL015.pdf.jpgNov-1992Les Mines Selbaie : decommissioning with ecological engineeringBoojum Research Limited; BP Resources Canada Limited
AR003.pdf.jpgMar-1987Ecological engineering : tests of concepts and assumptions on Levack, Year 2: confirmation of conceptsKalin, Margarete A.