Search


Current filters:
Start a new search
Add filters:

Use filters to refine the search results.


Results 31-40 of 47 (Search time: 0.055 seconds).
Item hits:
Issue DateTitleAuthor(s)
21-Feb-1992Ecological engineering and the Chara process applied to the Rabbit Lake drainage basin : final report / for CAMECOSmith, M. P.; Kalin, Margarete
Dec-1984Long-term ecological behaviour of abandoned uranium mill tailings : 2. growth patterns of indigenous vegetation on terrestrial and semi-aquatic areasKalin, Margarete; Environment Canada; Atomic Energy Control Board; Energy, Mines and Resources Canada
31-Mar-1991Periphyton communities as biological polishing agents in mine waste waters and the precipitation process in tailings : final report.Kalin, Margarete; Wheeler, W. N.; Van Everdingen, R. O.; Canada Centre for Mineral and Energy Technology
Mar-1988The development of ecological engineering and biological polishing methods for the Metsite.Kalin, Margarete
20-Dec-1994Decommissioning of the South Bay Mine using ecological engineering : final report.Kalin, Margarete
14-Jan-1992Biological cycling of arsenic in sediments impacted by gold mill effluents.Kalin, Margarete; Boojum Research Limited, Ontario Ministry of the Environment
Jun-1999Phytoplankton in mine waste water community structure, control factors and biological monitoringCao, Yong; Kalin, Margarete
May-1996Controlling factors in the production of extracellular polysaccharides in phytoplankton : final reportKalin, Margarete; Olaveson, M.
Dec-1992The application of ecological engineering for close-out at Buchans : final report /prepared for Mr. George Neary, Joint Venture Group at Buchans NFLD., ASARCO INC. - Abitibi-Price Inc.Kalin, Margarete
Jul-1993The application of ecological engineering to Selminco Summit : final report / prepared for: G. LandryKalin, Margarete