Search


Current filters:
Start a new search
Add filters:

Use filters to refine the search results.


Results 1-10 of 35 (Search time: 0.003 seconds).
Item hits:
PreviewIssue DateTitleAuthor(s)
SB007.pdf.jpgJun-1989The abandonment of the South Bay waste management area.Boojum Research Limited; BP Resources Canada Limited
SB094.pdf.jpgDec-2000pH history and potential pH development for 1996 and 1998 water samples from selected piezometers at South Bay.Boojum Research Limited
GM005.pdf.jpg15-Jul-2002Unterstutzung bei der ansiedlung von characeen (Chara /Nitella-Arten) : bericht 4Boojum Research Limited
KN001.PDF.jpgDec-1993Evaluation of passive process water treatment.Boojum Research Limited; Kennecott Corporation, Plant Projects Group
TM001.pdf.jpgAug-2003General observations and summary comments on monitoring data : visit to McIntyre closure sites including tailings pond plus superficial inspection of ERG tailings site : Timmins August 18-19, 2003 -- meetings with Joint Venture and site visits.Michael P. Sudbury Consulting Services; Boojum Research Limited; Joint Venture Group
SB018.pdf.jpgApr-1992EM survey, South Bay Reclamation Project, South Bay, Ontario.Geomar Geophysics Limited; Boojum Research Limited
CN028.PDF.jpgNov-1996Nickel and arsenic adsorption onto mucilage producing algal colonies : final report : CANMET, CAMECO - March 1997Boojum Research Limited
TM002.pdf.jpg23-Feb-2004McIntyre Tailings Dam No. 3 : laboratory analysis.Boojum Research Limited
SB043.pdf.jpgNov-1995EM surveys maps, Mud Lake area and interpretation of electromagnetic surveys and follow-up anomaly testing (piozemeter installation), September 30, 1995 : final report 1995.Boojum Research Limited
GC005.PDF.jpgNov-1997ARD/AMD potential of the waste management area : Goldcorp Inc., Red Lake Mine Division, Balmertown, Ontario : final report.Boojum Research Limited