Browsing by Subject decommissioning mine
Showing results 1 to 5 of 5
Preview | Issue Date | Title | Author(s) |
| Dec-1992 | The application of ecological engineering for close-out at Buchans : final report /prepared for Mr. George Neary, Joint Venture Group at Buchans NFLD., ASARCO INC. - Abitibi-Price Inc. | Kalin, Margarete A. |
| 22-Dec-1993 | The decommissioning of Buchans unit : assessment of hydrological modifications and implementation of biological polishing (stage 1) : 1993 /final report / Prepared for G. Neary, Buchans Unit, ASARCO, Joint Venture Group at Buchans NFLD., ASARCO INC. Abitibi-Price Inc. | - |
| 15-Jan-1994 | The decommissioning of Buchans Unit and implementation of biological polishing : 1994 final report / prepared for G. Neary, Buchans Unit, ASARCO, Joint Venture Group at Buchans NFLD, ASARCO INC. - Abitibi-Price Inc. | - |
| 21-Feb-1992 | Ecological engineering and the Chara process applied to the Rabbit Lake drainage basin : final report / for CAMECO | Smith, M. P.; Kalin, Margarete A. |
| 16-Jan-1996 | Polishing ponds performance evaluation and long term considerations : 1995 final report / Prepared for G. Neary, Buchans Unit, ASARCO Joint Venture Group at Buchans NFLD ASARCO INC. - Abitibi-Price Inc. | - |